Precision Manufacturing & Quality Control for Wind Turbine Gearbox Core Components
Challenge
A wind turbine equipment manufacturer needed core transmission components for MW-class gearboxes with tolerances ≤5μm, 30% improved corrosion resistance in salt spray environments, and a 20% reduction in delivery lead time.
Solution
We delivered an end-to-end solution:
- 5-axis CNC machining with vacuum nitriding from our 60+ surface finish options
- Full-process CMM inspection + salt spray simulation testing for stable performance
- Full-link supply chain visual management to optimize production scheduling
Result
The delivered components achieved stable tolerances of 3-4μm, 35% improved salt spray corrosion resistance, and a 22% reduction in delivery lead time. We maintained zero defects in 12 months of mass production, meeting the extreme working condition requirements of wind power equipment.